Electrical Engineer

Omilos Group

14-09-2008 | EXPIRA LA 20-09-2008

Job expirat

RESPONSABILITATI

- Designs and plans layout of generating plants, transmission and distribution line
- Directs preparation of, or prepares drawings and specific type of equipment and materials to be used in construction and equipment installation.
- Estimates labor, material, construction, and equipment costs. Inspects completed installations for conformance with design and equipment specifications and safety standards
- Coordinates operation and maintenance activities to ensure optimum utilization of power system facilities
- Observes operation of installation for conformance with operational standards
- Prepares the Technical solutions where is necessary
- Perform basic engineering calculations, prepare specifications, reports and related data tables
- Collaborates with the other engineering teams


CERINTE

- Bachelor’s Degree in Electric Engineering or Electro Technical Engineering within Polytechnic University of Bucharest – Electrical Or Electro Technical Faculty
- Minimum 3 years experience on a similar position
- Software known: MS Office, AutoCAD 2D
- Good knowledge of English language
- Available to travel ; Driving license B
- Flexible and fast learner, reliability and honesty


BENEFICII OFERITE

- EXCELLENT SALARY PACKAGE
- The opportunity to work, learn and develop your skills in a growing company;
- Training
- Meal vouchers
- Life and medical insurance


DESCRIEREA FIRMEI

OMILOS GROUP is an international partnership of real estate companies, based in Romania and United Kingdom that covers up a complete range of activities, including land purchasing, planning, development, and project management. We plan on investing in the next 2 years over EUR 300 million in real estate projects located in Romania’s most important cities. Our latest projects are: ERA SHOPPING PARK Iasi and ERA SHOPPING PARK Oradea.

ERA SHOPPING PARK IASI
Covering over 350,000 sq m plot of land, ERA SHOPPING PARK will be the largest retail park in Romania outside Bucharest. With a total built surface of 100,000 sq m, 77,000 sq m leasable area, and 3,000 parking places, ERA SHOPPING PARK will be operational in two phases:
- First Phase will open in the Summer of 2008 and it will comprise: Carrefour Hypermarket (15,440 sq m), Carrefour Gallery (16,000 sq m – fully leased), Praktiker Do It Yourself (9,350 sq m), Media Galaxy (3,565 sq m)
- Second Phase will open in the Summer of 2009 with ERA SHOPPING MALL (35,000 sq m), Mobexpert (8,000 sq m), and other 3 medium size units.

ERA SHOPPING PARK ORADEA
Era Shopping Park is the biggest shopping scheme to be developed in Oradea City, having a total surface of approx. 78,000 sq m, out of which 62,740 sq m represents the letting area. The project consists in a shopping mall of 38,761 sq m GLA anchored by Carrefour (hypermarket), Bricostore (DIY), Mobexpert (large furniture store) and Media Galaxy (electrical goods unit). The shopping mall include around 110 shops, out of them 11 are medium and large space units. Era Shopping Park Oradea will also be operational in two phases:
- First Phase is to be delivered December 2008
- Second phase is to be delivered in the first semester of 2009