Asistenta clienti
Esti candidat? Cauta job
Locuri de munca

CUMPARA CV1.99 euro

Deblocati Datele de contact pentru suma de 1.99 euro/CV prin creditul Myjob.

Operatiuni CV

[fotografie]

I****** C******

45 years / M / Craiova | Last update: 27-06-2014

Phone:
********
Email:
********
Address:
********
Birth date:
14-12-1968
  • Experience

    Senior Consulting Electrical and I&C Engineer

    ILF Consulting Engineers

    02/2013 - now | Arabia Saudita

    Domain: Engineering / Technology

    Responsibilities: Senior Consulting Electrical and I&C engineer for Saudi Electricity Company (KSA) – Project: New Fuel Oil Unloading Marine Terminal (Jetty) - Rabigh Power Plant
    Focusing on design review and site supervision erection and commissioning for RPP Jetty#2 project for all the electrical and I&C systems:
    a) Electrical:
    - MV cells
    - MV/LV transformers
    - LV Switchgear- MCC and Subdistribution Panel
    - DC and UPS system
    - Cathodic Protection
    - Power and Control Cable system
    - Cable tray and Duct banks
    - Lighting
    - Grounding and Lightning system
    - Interfaces
    b) Instrumentation and Control
    - Control and monitoring including DCS
    - CCTV
    - Communication System (telephone and PAGA)
    - Fire Detection & Alarm system
    - Marine system
    - Interfaces
    The main responsibilities:
    - Review, comments and approve the basic and detail engineering as well subcontractor / vendor documents provide by EPC contractor
    - Review, comments and approve the ITP and all check list for SAT
    - Supervise the inspection submitted by QA/QC of the EPC contracting for site inspection and...
    Senior Consulting Electrical and I&C engineer for Saudi Electricity Company (KSA) – Project: New Fuel Oil Unloading Marine Terminal (Jetty) - Rabigh Power Plant
    Focusing on design review and site supervision erection and commissioning for RPP Jetty#2 project for all the electrical and I&C systems:
    a) Electrical:
    - MV cells
    - MV/LV transformers
    - LV Switchgear- MCC and Subdistribution Panel
    - DC and UPS system
    - Cathodic Protection
    - Power and Control Cable system
    - Cable tray and Duct banks
    - Lighting
    - Grounding and Lightning system
    - Interfaces
    b) Instrumentation and Control
    - Control and monitoring including DCS
    - CCTV
    - Communication System (telephone and PAGA)
    - Fire Detection & Alarm system
    - Marine system
    - Interfaces
    The main responsibilities:
    - Review, comments and approve the basic and detail engineering as well subcontractor / vendor documents provide by EPC contractor
    - Review, comments and approve the ITP and all check list for SAT
    - Supervise the inspection submitted by QA/QC of the EPC contracting for site inspection and test (receiving materials, installation, pre-commissioning, commissioning) and including the final approval by signing in the name of the SEC
    - Review and approved the method statement presented by main contractor
    - Coordination the EPC contractor’s engineers in the process of engineering, procurement, construction and commissioning
    - Participating in weekly progress meeting with parties involved in the project
    vezi mai mult

    Electrical and I&C Site Supervisor and Commissioning Coordinator

    SIEMENS Site Turceni Power Plant (employed on the project)

    06/2009 - 01/2013 | Turceni, ROMANIA

    Domain: Engineering / Technology

    Responsibilities: Coordination activity of Electrical and I&C Site Supervisor and Commissioning for WFGD Turceni Power Plant unit 3-6 (4*330 MVA), SIEMENS Viena Project:
    -erection;
    -commissioning;
    The following systems of electrical and I&C part:
    -Auxiliary service transformers 40 MVA, 24/6 kV
    -MV Switchgears
    -Auxiliary WFGD MV Transformers 6/0.4 kV
    -MCC
    -LV Switchgears and Auxiliary Panel Distribution
    -UPS systems
    -DC Systems
    -Protection units (reconfiguration)
    -Grounding
    -Lighting
    -Command, control, protection, signalization, interlocking signals
    - Interconnection with existing Electrical control room and thermal control rooms
    -power and control cables system
    -cables trays and cables routes
    -DCS
    -valves
    -field instruments
    Coordination activity of Electrical and I&C Site Supervisor and Commissioning for WFGD Turceni Power Plant unit 3-6 (4*330 MVA), SIEMENS Viena Project:
    -erection;
    -commissioning;
    The following systems of electrical and I&C part:
    -Auxiliary service transformers 40 MVA, 24/6 kV
    -MV Switchgears
    -Auxiliary WFGD MV Transformers 6/0.4 kV
    -MCC
    -LV Switchgears and Auxiliary Panel Distribution
    -UPS systems
    -DC Systems
    -Protection units (reconfiguration)
    -Grounding
    -Lighting
    -Command, control, protection, signalization, interlocking signals
    - Interconnection with existing Electrical control room and thermal control rooms
    -power and control cables system
    -cables trays and cables routes
    -DCS
    -valves
    -field instruments

    Lead Electrical Engineer

    ALSTOM Power ECS Romania

    05/2007 - 05/2009 | BUCURESTI, ROMANIA

    Domain: Engineering / Technology

    Responsibilities: Management and coordonation all activity of electrical part (Engineering, erection and commissioning) for WFGD Rovinari Power Plant unit 3+6 (2*330 MVA):
    -Auxiliary service transformers 25 MVA, 24/6 kV
    -MV Switchgears
    -Auxiliary WFGD MV Transformers 6/0.4 kV
    -LV Switchgears
    -UPS systems
    -DC Systems
    -Protection units (reconfiguration)
    -Earthing and Lightning
    -Lighting
    -Command, control, protection, signalization, interlocking
    - Interconnection with existing Electrical control room and thermal control rooms
    -DCS electrical part (electrical signals, supply, etc)
    -valves and instrumentations
    -MV and LV power cables
    -control cables
    -cables trays and routes of cables
    Management and coordonation all activity of electrical part (Engineering, erection and commissioning) for WFGD Rovinari Power Plant unit 3+6 (2*330 MVA):
    -Auxiliary service transformers 25 MVA, 24/6 kV
    -MV Switchgears
    -Auxiliary WFGD MV Transformers 6/0.4 kV
    -LV Switchgears
    -UPS systems
    -DC Systems
    -Protection units (reconfiguration)
    -Earthing and Lightning
    -Lighting
    -Command, control, protection, signalization, interlocking
    - Interconnection with existing Electrical control room and thermal control rooms
    -DCS electrical part (electrical signals, supply, etc)
    -valves and instrumentations
    -MV and LV power cables
    -control cables
    -cables trays and routes of cables

    Electrical Project Mananager for Project Pirelli Tyres Slatina (employed for this project)

    Technologie Management Gruppe Romania

    06/2004 - 04/2007 | Slatina, ROMANIA

    Domain: Architecture / Constructions / Design

    Responsibilities: All electrical part for project PIRELLI TYRES ROMANIA SLATINA :
    -responsible for all aspect Electrical Instalations;
    -Coordination and management of Electrical Contractors;
    -Liaise and coordinate with the arhitectural ;
    -liaise and advice upon commercial aspect;
    -Monitor and report progress of the works;
    -Resole technical and on the site installation isuues so as to enure coordination and progress of other tades;
    -Monitor the quality and compliance of installation;
    -Maintain As build records; Assist in the planning of the works and develop a coordinated testing and commissioning schedule;
    -Develop operating and maintenance manual;
    -Liaise with statutory authorities.)
    All this part for:
    -electrical distribution (low,medium and high voltage);
    -electrical monitoring system SCADA and BMS;
    -fire detecting system;
    -video security ,telephone and data,control access systems ,etc.
    All electrical part for project PIRELLI TYRES ROMANIA SLATINA :
    -responsible for all aspect Electrical Instalations;
    -Coordination and management of Electrical Contractors;
    -Liaise and coordinate with the arhitectural ;
    -liaise and advice upon commercial aspect;
    -Monitor and report progress of the works;
    -Resole technical and on the site installation isuues so as to enure coordination and progress of other tades;
    -Monitor the quality and compliance of installation;
    -Maintain As build records; Assist in the planning of the works and develop a coordinated testing and commissioning schedule;
    -Develop operating and maintenance manual;
    -Liaise with statutory authorities.)
    All this part for:
    -electrical distribution (low,medium and high voltage);
    -electrical monitoring system SCADA and BMS;
    -fire detecting system;
    -video security ,telephone and data,control access systems ,etc.

    supervisor electrical engineer -erection and commissioning

    Energomontaj Bucuresti.Divizia Instalatii electrice si Automatizari.I.E.A.Turceni

    08/1998 - 06/2004 | BUCURESTI, ROMANIA

    Domain: Engineering / Technology

    Responsibilities: Coordinating working for erection and commissioning :
    -installation and points of transformers 0,4/6/24/400 KV ;
    -Switchgear +/-24 Vdc, 220 Vdc, 0,4 KVac,
    6 KVac, 400 Kvac;
    -electrical rectifiers (AEG),inverter (AEG), batteries 220Vdc and +/- 24 Vdc;
    -pumps station and compressors stations;
    -route cables and electrical cables, included heat terminations;
    -earth circuits;
    -switchboard ,control and command panel;
    -installation warning and put out fire;
    -loop adjustment automation (with PLC), included (measure temperature, pressure ,debit, level, special measure), valves, distribute fram and cotrol room;

    Coommissioning included and adjustment circuit breaker, relays, valve, tries cable, busbar, electric motors and electric equipment;
    Employment details and most relevant projects:
    S.E.Turceni-Rehabilitation unit 4+5 (330 +330 MW) -GEneral antreprenor ABB :
    -switchgear 220 Vdc, +/- 24 Vdc;
    -switchgear 0,4 Kv;
    -switchgear 6 KV;
    -switchgear 400 KV;
    -transformer 400 MVa,24/400 KV and 2x25 MVA, 24/6 KV;
    -unit protection (with PLC) REG 216;
    -installation of...
    Coordinating working for erection and commissioning :
    -installation and points of transformers 0,4/6/24/400 KV ;
    -Switchgear +/-24 Vdc, 220 Vdc, 0,4 KVac,
    6 KVac, 400 Kvac;
    -electrical rectifiers (AEG),inverter (AEG), batteries 220Vdc and +/- 24 Vdc;
    -pumps station and compressors stations;
    -route cables and electrical cables, included heat terminations;
    -earth circuits;
    -switchboard ,control and command panel;
    -installation warning and put out fire;
    -loop adjustment automation (with PLC), included (measure temperature, pressure ,debit, level, special measure), valves, distribute fram and cotrol room;

    Coommissioning included and adjustment circuit breaker, relays, valve, tries cable, busbar, electric motors and electric equipment;
    Employment details and most relevant projects:
    S.E.Turceni-Rehabilitation unit 4+5 (330 +330 MW) -GEneral antreprenor ABB :
    -switchgear 220 Vdc, +/- 24 Vdc;
    -switchgear 0,4 Kv;
    -switchgear 6 KV;
    -switchgear 400 KV;
    -transformer 400 MVa,24/400 KV and 2x25 MVA, 24/6 KV;
    -unit protection (with PLC) REG 216;
    -installation of treatment water;
    -by-pass ,circuit;water, steamer live, oil, gas;
    S.E.Doicesti-switchgear 6 Kv;
    S.E.Craiova -By-pass;
    S.C.Petrom Turburea and Petrom Stoina - electrical installation for pumps stations.
    vezi mai mult

    Electrical engineer at the Power and Mechanical Department

    R.A.H.Petrosani

    01/1994 - 07/1998 | Petrosani, ROMANIA

    Domain: Production

    Responsibilities: Mentenance, repairs and revision:
    -switchgear 0,4 KV, 6 KV, panels command and control;
    -points of transformer 20/6 KV and 6/o,4 KV;
    -installation railway transport,rectifier ;pumps station, compressors station, fans station;
    -lifting installation;
    Inspection,verification,control electrical installation and equipment.
    Supervision erection and commissioning equipment, provisioning with piece of exchange
    Mentenance, repairs and revision:
    -switchgear 0,4 KV, 6 KV, panels command and control;
    -points of transformer 20/6 KV and 6/o,4 KV;
    -installation railway transport,rectifier ;pumps station, compressors station, fans station;
    -lifting installation;
    Inspection,verification,control electrical installation and equipment.
    Supervision erection and commissioning equipment, provisioning with piece of exchange

  • Studies

    Aeronautical high school (Craiova), ROMANIA

    High school

    Profile Electronica

    Description: Electronic profile

    01/1983 - 01/1987

    Faculty Electrotechnics (Craiova), ROMANIA

    Faculty degree

    Profile Inginer Electric

    Description: Profile electrical enginner.
    Average study years:9,14 and final degree 10

    Note: 9.14

    01/1988 - 01/1987

  • Abilities

    Language English:
    Advanced
    Driving license:
    B - 1997
    Other abilities:
    Good coordinator
  • Objective

    Coordinate big projects.

  • Wanted job

    Domain:
    Engineering / Technology
    Type of wanted job:
    Full-time
    Statute:
    I have a job. Looking only for special offers.
    Available
    over 15 days
    Travel time in the interest of job:
    25%