[fotografie]

C****** M******

 


49 years / M / | Last update: 23-07-2014


CUMPARA CV1.99 euro

Deblocati Datele de contact pentru suma de 1.99 euro/CV prin creditul Myjob.

Studies

01/1982 - 01/1986

Liceul Industrial de petrol si gaze Tg-ocna ROMANIA

High school

Experience

Floorman,Derrickman,Assistent driller

E.U.A. ABU DHABI N.D.C. (National Drilling Company) ( 03/2002 - now )

Responsibilities: The Derrickman operates,monitors and maintains all drilling fluid systems and equipment associated with drilling oil and gas wells from an offshore drilling unit;directs and coordinates work activies associated with drilling fluid system and equipment operations and works aloft in the derrick and/or at rig floor piperacker console running and retrieving drill string sections from the well bore.

Maintains mud properties as determined by drilling program.Monitors mud pit level and advises Driller or loss or gain.Directs mud flow(circulation) from mud pits to hole and return as directed by Driller.
Assists in drill pipe handling from monkey board(other) while tripping into or out of hole.
Monitors trip tank as required by the operation and advises Driller of unforeseen changes in level.Assists on rig floor as required.
Receives and ships dry bulk mud materials from supply boat to proper bulk storage pods.
Assists cementing subcontractor representative with cementing operations as directed.
Performs routine rig maintenance as required with specific attention to:
-pump room equipment
-mud pits
-cement room equipment
-pipe stabber
-pipe racker
-swivel
-hook block assembly
-Top Drive assembly

Floorman

ENI SAIPEM-Italian Company ( 02/2001 - 02/2002 )

Responsibilities: IN NIGERIA(SAIPEM 10000)

Operation on various pipes handling equipment while making pipe connections,tripping,testing,etc.
During periods when the drill string is on bottom drilling,assists in preparing additional drill pipe,collars,or special tools to be run into the hole.Also at this time,rig floor equipment is examined and serviced.Tools,equipment and supplies are obtained and made ready for the next phase of the operation.
Prior to completing the well,the drilling crew is responsible for retrieving the drill steam and BOP equipment such that the well can be plugged and abandoned or completed.All equipment is to be returned to its proper storage location and made ready for us again or replaced if damaged.

Derrickman

S.N.C. Lavalin International ?Canadian Co. Libyan brench ( 01/1997 - 05/2001 )

Responsibilities: In Libya, Tazerbo Site for the Project ?GREAT MAN MADE RIVER? :
- work on derrick floor during tripping and respect exactly the safety regulations.
- center drill pipe stands and casing for running in hole.
- handle drill pipe stands during POOH and put them into set back.
- make fill line before POOH and operate all valves at BOP manifold as required.
- collect mud samples necessary for lab analysis, in absence of mudman.
- help in drilling fluid treatment.
- measure mud level from tanks and warning about any increase /decrease or
gasification.

Floorman, Derrickman,Assistant Driller, Mudman

FOSERCO S.A. Tg.Ocna- Romanian Drilling Co ( 02/1986 - 02/1997 )

Responsibilities: Floorman, Derrickman,Assistant Driller, Mudman
as Floorman, Assistent Driller- duties:-different type of Romanian drilling rigs : T 50, F 100, F 125, F 200, F 320, F 400
- checking and maintenance the drilling equipment
- manipulating elevators, fixing and storing the drill pipe
- maintenance the auxiliary equipment : control panel, drill pipe, cable
- control and take in charge the pipe racks, tanks and reservoirs, inform assistant
driller or driller about any deficiency.
- work on pipe rack with the other floorman, with derrickman and assistant driller
-to prepare and ensure the tubular goods, depending on RIH or POOH priority.
- during tripping operate the slips, elevator, safety clamp, tongs, cathead etc.
- participate in preparation of drilling fluid , maintain in good condition the screens

Floorman

FORASOL France - Amoco ( 06/1995 - 10/1996 )

Responsibilities: 5001 Lapos ROMANIA - AMOCO Project
- work on derrick floor during tripping and respect exactly the safety regulations.
- centre drill pipe stands and casing for running in hole
- handle drill pipe stands during POOH and put them into set back
- make fill line before POOH and operate all valves at BOP manifold as required
- collect mud samples necessary for lab analysis, in absence of mudman.

Certifications / Courses

BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY TRAINING (ITALY , 2001)BASIC HYDROGEN SULFIDE SAFETY AWARENESS ( Abu Dhabi, E.U.A. 2002,2003,2004),ADVANCED FIRE FIGHTING (2002).

Abilities

Language English:
Intermediate
Language Italian:
Beginner
Driving license:
B - 1994